PUMP NOTES:
Ready to work.
Boom Inspection: Current.
New: Scanreco receiver (12/23), 2nd section hyd cylinder seals (2/25), dump valve coil, grease dis. block (7/25), turret horsehead & bushings (11/25).
Overall Condition: Good.
TRUCK NOTES:
Ready to work.
DOT Inspection: Current.
New: Turbo (4/23), brakes and drums (4/25), trunnions on both axles (4/25).
Overall condition: Good.
Disclaimer: Listing information is provided by the seller. Global Concrete Pumps acts solely as a broker connecting buyers and sellers and does not own, inventory, or house listed equipment. Buyers are responsible for due diligence. All equipment is sold as-is, where-is, with no guarantees or warranties.




