PUMP NOTES:
Ready to work.
Boom Inspection: Current.
New: deck pipe, material cylinders, transitions, mud cups, spectacle plate, cutting ring (06/25), front and rear s-tube bearings (11/25).
Overall Condition: Good.
TRUCK NOTES:
Ready to work.
DOT Inspection: Current until 03/2026.
New: transmission (11/25), radiator (12/25), DPF filter (04/24), fuel injector and cups (04/24).
Overall Condition: Good.
Disclaimer: Listing information is provided by the seller. Global Concrete Pumps acts solely as a broker connecting buyers and sellers and does not own, inventory, or house listed equipment. Buyers are responsible for due diligence. All equipment is sold as-is, where-is, with no guarantees or warranties.




